Ala Moana Condo is on sale, please seize the opportunity.
Brief Introduction of Ala Moana Condo

Project Name: Ala Moana Condo

Project Address: 710 SHERIDAN ST, HONOLULU, HI 96814, UNITED STATES

Project Video: Click here


360-degree view of Ala Moana Condo project: Click here

360-degree view of swimming pool in Ala Moana Condo:Click here

360-degree view of children's activity area in Ala Moana Condo:Click here

360-degree view of GYM in Ala Moana Condo:Click here

360-degree view of small theater in Ala Moana Condo:Click here

360-degree view of owners' activity center in Ala Moana Condo:Click here


Project introduction:

The project has 184 condominiums and some business units. It is a commercial and residential project. The total height of the building is about 250 feet.

Including:

  • Three retail commercial stores and some parking lots on the first floor.
  • Parking lots on the 2nd to 5th floor.
  • Public facilities on the 6th floor, including swimming pool, owners' activity center, GYM, small theater, Children's activity area and 4 residential units.
  • Affordable housing on the 6th floor(1 unit) to 10th floor.
  • Condominiums sold at market price on the 6th floor(3 units) and on the 11th floor to 27th floor (No 13th floor).
  • The parking space and public support area of the project is approximately 180,000 square feet.
  • 184 condominiums cover an area of approximately 140,000 square feet.
  • The commercial area is about 7,000 square feet.
  • This is a real estate development project with the standards of hotel property management.

Projects completed before 2019: Planning approval, construction drawing design, foundation engineering construction permit approval, house pre-sale permit.

The project has started in March 2019.

Due to cooperation with the soil report project of the Hawaii Health Bureau, and the impact of CV-19.

The project has been stopped for 3 years. The soil report has been processed and completed.

Currently readjusting construction drawings and reapplying for construction permits.

Plan to resume construction time: May 2025, It will be completed in December 2027.

Project Brochure:Click here to browse

Photo gallery of the urban environment of Honolulu, Hawaii